Northeast Gateway Water Supply Main

Share Northeast Gateway Water Supply Main on Facebook Share Northeast Gateway Water Supply Main on Twitter Share Northeast Gateway Water Supply Main on Linkedin Email Northeast Gateway Water Supply Main link

The Northeast Gateway Water Supply Main project is designed to improve water quality in Sylvan Lake. This is part of a long-term water sustainability project for the community, as directed by the 2020 Water Master Plan. It will enhance system reliability and how treated water gets to Lakers. All the work being performed has been and continues to be discussed and shared with the province, County of Red Deer, and CN Rail to ensure we continue to meet their requirements. This work includes:

  • Installing a second water supply main that ties to the North Reservoir
  • Assessing the old water main to plan for future enhancements

Why?

  • Reducing our dependency on the existing water supply main
  • Increasing water supply capacity to the lower zone
  • Enhancing the north water supply main will ensure long-term sustainability for future cost savings
  • Increasing the life cycle of the north water supply system

Where?

  • The project begins at the North Reservoir and follows Township Road 391 to Range Road 12 (30 Street), ending at Cuendet Industrial Way
  • View the project map

When?

Multiple stages, including:

  • Stage 1 - September 2025 to December 2025: Contract Tendering & Financial Approval (Complete)
  • Stage 2 - Estimated February 2026 to December 2026: Construction
  • Stage 3 - Estimated Fall 2026 to Fall 2027: Remediation

How does this impact residents, and what do you need to know?

  • Water service will remain active throughout the project
  • Access to residents and businesses will be maintained at all times
  • Traffic will be reduced to one lane while passing active construction sites
  • Detour routes will be implemented at times when full road closures are required
  • The new supply main will extend the life of the system and prepare the community for long term needs
  • No changes to water quality are anticipated, and all work is conducted under strict regulatory and operational controls
  • The hours of construction shall be from 7:00 AM to 7:00 PM Monday to Saturday. Sunday work and evening work may also be required as weather and schedule requirements dictate.

Read more about the Water Master Plan(External link) and stay tuned for more information on how the Town is investing in a healthy water future for Lakers.

The Northeast Gateway Water Supply Main project is designed to improve water quality in Sylvan Lake. This is part of a long-term water sustainability project for the community, as directed by the 2020 Water Master Plan. It will enhance system reliability and how treated water gets to Lakers. All the work being performed has been and continues to be discussed and shared with the province, County of Red Deer, and CN Rail to ensure we continue to meet their requirements. This work includes:

  • Installing a second water supply main that ties to the North Reservoir
  • Assessing the old water main to plan for future enhancements

Why?

  • Reducing our dependency on the existing water supply main
  • Increasing water supply capacity to the lower zone
  • Enhancing the north water supply main will ensure long-term sustainability for future cost savings
  • Increasing the life cycle of the north water supply system

Where?

  • The project begins at the North Reservoir and follows Township Road 391 to Range Road 12 (30 Street), ending at Cuendet Industrial Way
  • View the project map

When?

Multiple stages, including:

  • Stage 1 - September 2025 to December 2025: Contract Tendering & Financial Approval (Complete)
  • Stage 2 - Estimated February 2026 to December 2026: Construction
  • Stage 3 - Estimated Fall 2026 to Fall 2027: Remediation

How does this impact residents, and what do you need to know?

  • Water service will remain active throughout the project
  • Access to residents and businesses will be maintained at all times
  • Traffic will be reduced to one lane while passing active construction sites
  • Detour routes will be implemented at times when full road closures are required
  • The new supply main will extend the life of the system and prepare the community for long term needs
  • No changes to water quality are anticipated, and all work is conducted under strict regulatory and operational controls
  • The hours of construction shall be from 7:00 AM to 7:00 PM Monday to Saturday. Sunday work and evening work may also be required as weather and schedule requirements dictate.

Read more about the Water Master Plan(External link) and stay tuned for more information on how the Town is investing in a healthy water future for Lakers.

  • Construction Notice – Cuendet Industrial Way

    Share Construction Notice – Cuendet Industrial Way on Facebook Share Construction Notice – Cuendet Industrial Way on Twitter Share Construction Notice – Cuendet Industrial Way on Linkedin Email Construction Notice – Cuendet Industrial Way link

    Construction is underway on the Northeast Gateway Water Supply Main. As of February 26, crews will be onsite at 56 Cuendet Industrial Way.

    During construction:

    • Water service will remain active
    • Your water remains safe to use
    • Access to residents and businesses will be maintained at all times
    • Traffic will be reduced to one lane while passing active construction sites
    • Detour routes will be implemented at times when full road closures are required

    Where do I find Construction notices?

    Questions?

  • System Integrity & Your Water Supply

    Share System Integrity & Your Water Supply on Facebook Share System Integrity & Your Water Supply on Twitter Share System Integrity & Your Water Supply on Linkedin Email System Integrity & Your Water Supply link

    When we talk about "improving water quality" for this project, we are talking about System Integrity and Reliability. This project is not a change to the chemical treatment, "softness," or mineral composition of your water. It is an investment in the infrastructure that delivers that water to your home.

    Strengthening our Water Network

    The Northeast Gateway project is the essential step in our larger 2020 Water Master Plan. It serves as a higher-capacity second connection to our water distribution system for our community. By completing this main now, we create the operational redundancy required to perform enhancements at the South Reservoir.

    By installing this second supply main, we are ensuring:

    • System resilience: This new line allows us to take other parts of the system, like water wells, offline for vital upgrades and maintenance without interrupting your service or compromising safety.

    • Consistent delivery: We are reducing the risk of service interruptions or pressure drops in the "lower zone," ensuring water stays moving and fresh.

    • Increased flow: A healthier network means better circulation throughout the Town, ensuring treated water meets strict regulatory standards from the reservoir to your tap.

    • Long-term sustainability: As Sylvan Lake grows, this infrastructure ensures our system can handle increased demand while continuing to meet all provincial health and safety requirements.

  • Stage 2: Pre-construction Set to Begin

    Share Stage 2: Pre-construction Set to Begin on Facebook Share Stage 2: Pre-construction Set to Begin on Twitter Share Stage 2: Pre-construction Set to Begin on Linkedin Email Stage 2: Pre-construction Set to Begin link

    Pre-construction of the Northeast Gateway Water Main Project will begin on February 23, 2026. This project is designed to improve water quality in Sylvan Lake.

    It will enhance system reliability and how treated water gets to Lakers.

    During construction:

    • Water service will remain active

    • Your water remains safe to use

    • Access to residents and businesses will be maintained at all times

    • Traffic will be reduced to one lane while passing active construction sites

    • Detour routes will be implemented at times when full road closures are required

    Questions?

    Ask them in our Ask and Answer section, and our team will answer them!

  • Budget

    Share Budget on Facebook Share Budget on Twitter Share Budget on Linkedin Email Budget link

    Total budget: $7,850,000

    Budget:

    Questions?

    • Ask your questions about the Northeast Gateway Water Supply Main project here!
Page last updated: 06 Mar 2026, 11:30 AM