The Town is beginning to plan for another section of 50 Street redevelopment from Memorial Trail to Perry Drive. No construction is included at this stage. The upgrade:

  • Improves traffic flow: Smoother movement of vehicles along 50 Street
  • Enhances safety for all users: improves sidewalk/pathway access for pedestrians
  • Grows with the Town: Ensures that 50 Street can accommodate increased traffic


Why plan now?

To save money, this project is being planned alongside the 50th Street and Memorial Trail roundabout project. Because this section of 50th Street connects with the roundabout, it will save money to do the design and feedback for both at the same time. While we are doing very early-stage planning and feedback now, this section of 50th Street construction will not start for many years.

  • To avoid delays: Starting the design of the section of 50 Street so the Town is “shovel ready” when funding is secured
  • For future growth: The upgrade prepares the intersection for community growth including:
    • New developments along the 50 Street corridor
    • Increasing traffic along 50 Street during peak tourist season
    • Population growth


When

Stage 1: Preliminary planning

  • Preliminary planning is completed alongside the Stage I Memorial Trail Roundabout project
  • Phase 1a: Preliminary Design and Engagement (May - Sep 2025)

Stage 2: Widening 50 Street

  • This stage is completed alongside the Stage 2 Memorial Trail Roundabout project
  • No estimated start date: Start budgeting for construction once growth demands 4 lanes to accommodate increased traffic
  • Widening of Memorial Trail and 50 Street to 4 lanes (from Memorial Trail to Perry Drive)
  • A two-way turn lane is proposed from Beacon Hill Drive to Cole Way to maintain all turns access for existing intersections and driveways
  • There are two options for 50 Street near the Lakeview Cemetery to include 4 lanes with a sidewalk, or 4 lanes with a pathway


We're listening

  • Learn about the proposed design and provide your feedback to help us finalize the plan
  • Open House at the Fun Fest Info Fair
  • Online Survey: Available between September 2 and 21, 2025


Learn about the project



The Town is beginning to plan for another section of 50 Street redevelopment from Memorial Trail to Perry Drive. No construction is included at this stage. The upgrade:

  • Improves traffic flow: Smoother movement of vehicles along 50 Street
  • Enhances safety for all users: improves sidewalk/pathway access for pedestrians
  • Grows with the Town: Ensures that 50 Street can accommodate increased traffic


Why plan now?

To save money, this project is being planned alongside the 50th Street and Memorial Trail roundabout project. Because this section of 50th Street connects with the roundabout, it will save money to do the design and feedback for both at the same time. While we are doing very early-stage planning and feedback now, this section of 50th Street construction will not start for many years.

  • To avoid delays: Starting the design of the section of 50 Street so the Town is “shovel ready” when funding is secured
  • For future growth: The upgrade prepares the intersection for community growth including:
    • New developments along the 50 Street corridor
    • Increasing traffic along 50 Street during peak tourist season
    • Population growth


When

Stage 1: Preliminary planning

  • Preliminary planning is completed alongside the Stage I Memorial Trail Roundabout project
  • Phase 1a: Preliminary Design and Engagement (May - Sep 2025)

Stage 2: Widening 50 Street

  • This stage is completed alongside the Stage 2 Memorial Trail Roundabout project
  • No estimated start date: Start budgeting for construction once growth demands 4 lanes to accommodate increased traffic
  • Widening of Memorial Trail and 50 Street to 4 lanes (from Memorial Trail to Perry Drive)
  • A two-way turn lane is proposed from Beacon Hill Drive to Cole Way to maintain all turns access for existing intersections and driveways
  • There are two options for 50 Street near the Lakeview Cemetery to include 4 lanes with a sidewalk, or 4 lanes with a pathway


We're listening

  • Learn about the proposed design and provide your feedback to help us finalize the plan
  • Open House at the Fun Fest Info Fair
  • Online Survey: Available between September 2 and 21, 2025


Learn about the project



Ask & Answered

Ask questions about the 50 Street project

Questions about the 50 Street project?

  • We are listening
  • If you have questions about the 50 Street project ask them below
  • We are doing our best to answer as quickly as we can


Questions about something else? 

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share Will the redevelopment include a bike lane for bike/scooter use? on Facebook Share Will the redevelopment include a bike lane for bike/scooter use? on Twitter Share Will the redevelopment include a bike lane for bike/scooter use? on Linkedin Email Will the redevelopment include a bike lane for bike/scooter use? link

    Will the redevelopment include a bike lane for bike/scooter use?

    Byronrogy asked 17 days ago

    Hi Byronrogy, 

    Thanks for your question. This redevelopment doesn’t include a bike lane as a portion of the roadway. In stage 1 of the 50 Street and Memorial Trail Roundabout projecta new multi-use pathway along the west side 50 Street (between Beacon Hill Drive and Memorial Trail) is an option and is not funded at this time. Completing the pathway depends on the available budget and may be implemented as a separate project in future.

    Make sure to complete the survey if you haven't already. That's the best way to make sure your feedback is included when the survey results are presented to Council. Visit the 50 Street and Memorial Trail Roundabout page to take the survey.  

    Sincerely,  
    David Yee 
    Project Manager/Asset Management, Engineering, Public Works 

Page published: 25 Aug 2025, 08:49 AM