50 Street and Memorial Trail Roundabout

Share 50 Street and Memorial Trail Roundabout on Facebook Share 50 Street and Memorial Trail Roundabout on Twitter Share 50 Street and Memorial Trail Roundabout on Linkedin Email 50 Street and Memorial Trail Roundabout link

The Town is building a roundabout at Memorial Trail and 50 Street. The roundabout upgrade:

  • Improves traffic flow: Smoother and faster movement of vehicles through the intersection, reducing delays and congestion
  • Enhances safety for all users: Lowers the risk of collisions by providing a more controlled and predictable traffic pattern
  • Grows with the Town: Ensures that the intersection can accommodate increased traffic


Why now?

The intersection is nearing capacity limits and needs upgrading as soon as possible. The Town is planning now:

  • To avoid delays: Starting the design of the roundabout so the Town is “shovel ready” when funding is secured
  • For future growth: The upgrade prepares the intersection for community growth including:
    • New developments along the Memorial Trail corridor
    • Increasing traffic along 50 Street during peak tourist season
    • Population growth


When

Stage 1: One lane roundabout

  • One lane roundabout designed to expand into 2 lane easily. This allows expenses to be spread over more time
  • Stage one includes an optional pathway that extends along 50 Street from Beacon Hill Drive to Memorial Trail. Completing the pathway depends on the available budget and may be implemented as a separate project in future
  • Stage one does not change any existing driveway access to 50 Street and Memorial Trail
  • The Roundabout project is planned alongside the 50 Street redevelopment project.
  • Phase 1a: Preliminary Design and Engagement (May - Sep 2025)
    • Status: Underway
  • Phase 1b: Detailed Design & Tender Package (TBD)
    • Status: Planning
  • Phase 2: Construction (2028)
    • Roundabout at 50 Street and Memorial Trail
    • Status: Planning

Stage 2: Two-lane roundabout


We're listening

  • Learn about the proposed roundabout design and provide your feedback to help us finalize the plan
  • Open House at the Fun Fest Info Fair
  • Online Survey: Available between September 2 and 21, 2025


Learn about the project

The Town is building a roundabout at Memorial Trail and 50 Street. The roundabout upgrade:

  • Improves traffic flow: Smoother and faster movement of vehicles through the intersection, reducing delays and congestion
  • Enhances safety for all users: Lowers the risk of collisions by providing a more controlled and predictable traffic pattern
  • Grows with the Town: Ensures that the intersection can accommodate increased traffic


Why now?

The intersection is nearing capacity limits and needs upgrading as soon as possible. The Town is planning now:

  • To avoid delays: Starting the design of the roundabout so the Town is “shovel ready” when funding is secured
  • For future growth: The upgrade prepares the intersection for community growth including:
    • New developments along the Memorial Trail corridor
    • Increasing traffic along 50 Street during peak tourist season
    • Population growth


When

Stage 1: One lane roundabout

  • One lane roundabout designed to expand into 2 lane easily. This allows expenses to be spread over more time
  • Stage one includes an optional pathway that extends along 50 Street from Beacon Hill Drive to Memorial Trail. Completing the pathway depends on the available budget and may be implemented as a separate project in future
  • Stage one does not change any existing driveway access to 50 Street and Memorial Trail
  • The Roundabout project is planned alongside the 50 Street redevelopment project.
  • Phase 1a: Preliminary Design and Engagement (May - Sep 2025)
    • Status: Underway
  • Phase 1b: Detailed Design & Tender Package (TBD)
    • Status: Planning
  • Phase 2: Construction (2028)
    • Roundabout at 50 Street and Memorial Trail
    • Status: Planning

Stage 2: Two-lane roundabout


We're listening

  • Learn about the proposed roundabout design and provide your feedback to help us finalize the plan
  • Open House at the Fun Fest Info Fair
  • Online Survey: Available between September 2 and 21, 2025


Learn about the project

Ask & Answered

Questions about the 50 Street and Memorial Trail Roundabout project?

  • We are listening
  • If you have questions about the 50 Street and Memorial Trail Roundabout ask them below
  • We are doing our best to answer as quickly as we can


Questions about something else? 

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 25 Aug 2025, 10:06 PM