Projects
To meet the needs in the our Sylvan Lake Lakefront Usage Strategy, Council approved these waterfront projects. We'll post more information about each project as it becomes available.
Capital Projects
2025
Public day mooring (2025)
A new public day mooring dock installed next to lighthouse park. This dock is for day use only, no overnight mooring
Details on pages 12, 19, 30 of the Lakefront Usage Strategy
- Status: installation July 30, 2025
Accessible ramp (2025)
A new accessible ramp into the water at approximately 42 street, off Centennial Park
Details on pages 24 of the Lakefront Usage Strategy
- Status: installation September, 2025
Pier improvements:
Aluminum ladder
The old ladders had broken rungs that exposed sharp edges. They were removed and replaced with safe aluminum ladders.
Status: installation June 2025
Electrical outlets
Added electrical outlets to the pier to accommodate the Winter Village light display and to assist with special events on the pier.
Lowering the number of extension cords needed, reducing the risk of tripping and falling.
Status: installation September 2025
Increasing pedestrian safety along the lakefront
Adding enhanced safety measures along a portion of the lakefront for the purpose of deterring and preventing any vehicles from entering the park and causing damage or harming people:
pebble bollards
steel bollards
benches
garbage bins
Status: ongoing and will be completed in 2026.
2026
Swim zone
Adding a swim zone in the bay to the west of the pier to create a safe area to separate swimming and boating
Details on pages 14, 19, 25 of the Lakefront Usage Strategy
Status: installation June 2026
Accessible dock
Adding a floating dock along the west side of the pier that will include mobility access to boats and the boating drop-off / pick-up location
Details on pages 12, 19, 27 of the Lakefront Usage Strategy
Status: installation June 2026
Increasing pedestrian safety along the lakefront continued
Continue adding safety measures along a portion of the lakefront for the purpose of deterring and preventing any vehicles from entering the park and causing damage or harming people
Status: ongoing and will be completed in 2026.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends